‘The devil is in the detail’: Peer-review of the wildlife conservation plan by the Wildlife Institute of India for the Etalin hydropower project, Dibang valley.

Publication Details
Zoo’s Print, May 2020
Publication Type
Blurb

This report was prepared in response to the Forest Advisory Committee’s (FAC) recommendation to conduct “a multiple seasonal replicate study on biodiversity assessment” of the 3097 MW Etalin Hydro Electric Project (HEP) in Dibang Valley, Arunachal Pradesh. The review has found that the study was conducted in under five five months from February to June 2018 and cannot be considered as a ‘multiple seasonal replicate’ study as it does not represent three seasons in Arunachal Pradesh.

Publication date( Day/Month/Year)
Image of the Publication
image
Author of the Publication
Designation
Professor
PhD Scholar
Co-authored or Co-edited
co-authored